Heartily welcomes to the side

DFK

Elektro- Schaltanlagen Systeme GmbH

Apprentice-education

Chances need the gives birth



Education-system: Model with future

During the Innsbrucker address the Siemens AG with the company DFK Elektro- Schaltanlagen Systeme GmbH of Rum a training group was agreed upon. Of the group the training is the center beyond the career profile.

In the career profiles "electronics engineer and electrical work technician" lead Siemens a group with the company DFK Elektro-Schaltanlagen Systeme GmbH in Rum with Innsbruck. With the group knowledge within the range of the production of a switchgear of the offer of the manufacturing is obtained up to examining plants finished placed. The time framework covers in each case 10 to 12 weeks in first and in second Year of apprenticeship. The group very successfully runs since 1998.
Our apprentices received starting from beginning of training with Siemens the basic training of approximately 12 weeks and are carried in further consequence distributed over entire training in special courses.

Walter Vedlin, describes the advantages for enterprises and apprentices to the chief instructor with Innsbrucker address of Siemens AG: "Our two groups are excellently accepted by the training, a further group is with Siemens in planning. Training groups generally represent a large enriching for the apprentice. Since the majority of the enterprises in Tirol small and middle enterprises are, there is much special specialized knowledge, but on the other side also problems with the training, in order the entire career profile to cover to be able (z.B. missing machines, Plants, Tools etc.). So the variety of operational structures and contents can step in the entire system of the training very favourably into feature into further consequence."
29.01.07 10:56

Establishment history

The company was founded on January the 1st 1998, DFK Elektro-Schaltanlagen Systeme went out of the former engineering and manufacturing center Innsbruck, the Siemens AG Austria out. Top trained coworkers, with experience year old up to 30 in the building of switchgears are to you at the disposal. You “know-how” guarantee greatest possible technical execution of the orders to the customer. Special solutions of most diverse customer requirements, by us are gladly taken over.

Enterprise guiding principles

  • Constant learning completes our technical knowledge.
  • Offering products of highest quality.
  • Friendly handling the customer maintain.

Field of activity

  • Switchgears for low-voltage to 1000V.
  • Manufacturing on the basis specific customers indicated.
  • Changes of existing plants suburb.

Günter Daubek
Managing director
Tel.: 0043 512 / 265 658 -11
E-Mail: g.daubek@dfk.at
Hugo Kostner
Attorney, Commercial line
Tel.: 0043 512 / 265 658 -12
E-Mail: h.kostner@dfk.at
Stefan Gritsch
Workshop line
Tel.: 0043 512 / 265 658 -16

Cableliner

Seilbahnen

Wasserkraftwerke

Holzbearbeitungsanlagen

Tunnelprojekte

Kälteanlagen

Clients

 
 
 

Contact

DFK Elektro- Schaltanlagen Systeme GmbH

Kaplanstraße 2
6063 Rum bei Innsbruck
Austria
Tel: 0043 512/265 658
Fax: 0043 512/265 658-50
Mobil: 0043 664/261 297 0

Contact-form

Company :
Firstname :
Lastname :
Phone :
Mail :
Text :

Wood processing plants

Wimmer Holzwerke
Rumänien Holzbearbeitungsanlage N601
Kogler Holz
Klausner Holz (Sachsen, Deutschland)
Klenk Baruth (Frankreich)
Ante (Deutschland)
Kaml & Huber
Binder Holz (Fügen)
Asiago Lengo (Italien)
Sägewerk Sparber
Back

Tunnel projects

Roppener Tunnel (Imst)
Neumarkt Tunnel (Mühlviertl)
Leermoos Tunnel
Kienbergwand Tunnel (Mondsee)
Tiergarten Tunnel (Berlin)
Hornberg Tunnel (Baden-Württemberg)
Wagenburg Tunnel (Stuttgart)
Back

Floodlight installation

Hötting West
Hötting Wiesengasse
Back

EDP distributor

Hypo Saggen
Hypo Bozen
Hypo Brixen
Hypo Trient
Hypo Imst
Back

Fire alarm systems

Perjen/Arlbergtunnel
Hotel Edelweiß
Back

Load current distributor

Landestheater (Innsbruck)
Chemische OFT (Plansee)
NS-Verteiler TZ81/TZ80
NS-Verteiler TZ5
Sandoz GmbH (Schaftenau)
Schönberggalerie
Back

Aerial ropeway plants

6SKB Christlum
8MGD Gipfelbahn Rauris
AR Eibseebahn
8CLD Tappenalm
8MGD Kasberg
6CLD Eggalm Nord
AR Stuttgart (Nostalgiebahn)
Pendelbahn Patscherkofel
Funitel Galzig
Schönleiten Gipfelbahn
2 SL Alpsee
AR Dachsteinbahn
8MGD Serfaus-Fiss
und noch weit über 100 Anlagen mehr!
Back

Refrigerant plants

Trafona Rast Tyrol (Autobahnraststätte)
Hotel Jagdhof
Interalpenhotel (Mösern)
Hotel Schwarzer Adler
Hotel Holiday (Sölden)
Kristallwelten Swarovski
Hotel Waldklause (Längenfeld)
Eisstadion (Innsbruck)
Burger King
Hotel Astoria
Casino Seefeld
Kongresshaus (Innsbruck)
Back

Snow plants

Kitzbühel (Hahnenkamm)
Brunnermais
Gaisberg
Kaltenbach
Schmittenhöhe (Zell am See)
Gasteiner Bergbahnen
Mölltaler Gletscher
Jochberg
Aschauer Ache
Back

Cableliner

CLS Toronto Airport
CLS Mandalay Bay (Las Vegas, Nevada)
CLS Birmingham (Großbritannien)
AICM Mexico Airport
Back

Power stations

Trojeralmbach
Timmelbach
AWKW Seefeld
FHKW Längenfeld
Zentrale Pradella (Schweiz)
KW Navisbach
KW Jenbach
Pumpwerk Gießenbach
KW Dorferbach
KW Schwarzach
Back

Automation plants

Bäckerei Ruetz
Horizontal Glühofen (Plansee)
Primas (Oberhofen)
ATM Hall
Schell (Italien)
Tyrolit
Bitbau Dörr
HWPW Kramsach
Asfinag (Schnellstraße A16)
Tiroler Röhrenwerk
Back

Waste-treatment plants

Thöni LaBuisse (Frankreich)
Thöni TDM Arezzo (Italien)
Thöni Wiener Neustadt
Thöni Jakusevec (Zagreb, Kroatien)
Thöni Liezen
Back

Water supply plants

Klärwerk Innsbruck
TWKW Wattens
WVA Ebbs
WVA Rum
WVA Huben
WVA Thaur
Tapfheim
Back

Need-stream-installations

Universitätsklinik Innsbruck
LKH Hochzirl
Technischeuniversität Graz
IKEA
Montanwerke (Brixlegg)
ÖBB
Swarovski
Bergwelt Obergurgel
Siemens (Wien)
Maillis
Back

  Elektro- Schaltanlagen Systeme GmbH

+++  Apprentice-education  +++  
To see the pictures and/or videos, please click on a desired topic
© 1998 - 2010 DFK Elektro- Schaltanlagen Systeme GmbH
All rights reserved
Imprint Disclaimer